Reinforcement works of the GP17 road from PK 179 to PK 202.5 (L = 23.5 Km) in the governorate of Kasserine LOT 13
- Contract amount: 3,837,700,500 TND
- Work execution time: 5 months
- Client: Ministry of Equipment (General Directorate of Bridges and Roads)
Consistency of the work
The work is summarized as follows:
. Repairs located in degraded parts of the road;
. Execution and implementation of a bonding layer on the old roadway;
. Execution and implementation of the reinforcement of the asphalt concrete pavement 0/14;
. Reloading and shoulder in all directions 0/40;
. Execution of the connection works of the reinforced roadway with all the arteries which connect to it;
. Execution of road marking works.